TORICH ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers

FOB Reference Price:Get Latest Price
$600.00 - $1,500.00 / Ton | 5 Ton/Tons (Min. Order)
Lead Time:
Quantity(Tons) 1 - 5 6 - 10 11 - 25 >25
Est. Time(days) 30 35 40 Negotiable
Report Suspicious Activity
Overview
Quick Details
Grade Group:
10#-45#
Grade:
10#, 20#
Thickness:
1 - 25.4 mm
Section Shape:
Round
Outer Diameter(Round):
12.7 - 177.8 mm
Place of Origin:
Zhejiang, China
Technique:
Cold Drawn
Certification:
ISO9001, ISO14001, TS16949
Alloy Or Not:
Non-alloy
Secondary Or Not:
Non-secondary
Product name:
Seamless Carbon Steel Boiler Tubes For High Pressure Boilers
Keyword:
Carbon Steel Boiler Tubes
Standard:
ASTM A192
Length:
customer requirement
Shape:
Round Shape
Usage:
Boilers/Superheaters
Supply Ability
Supply Ability:
20000 Ton/Tons per Year Carbon Steel Boiler Tubes
Packaging & Delivery
Packaging Details
Carbon Steel Boiler Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.
Port
Shanghai or Ningbo Port
Lead Time :
Quantity(Tons) 1 - 5 6 - 10 11 - 25 >25
Est. Time(days) 30 35 40 To be negotiated
Product Description
TORICH ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers
Standard
ASTM A192
Matrial
10# 20# etc Carbon Steel
Size
OD: 12.7-177.8mm  WT: 1-25.4mm  Length: according to customer requirement
Application
For Boilers,Superheaters, Heat-Exchangers, High-pressure Boilers
Production
Tubes are manufactured by seamless process and both hot finished and cold finished are applicable
Heat treatment
Hot finished tubes need not be heat treated.
Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher
Chemical Composition
C
0.06-0.18
Mn
0.27-0.63
P
≤0.035
S
≤0.035
Si
≤0.25
Mechanical Properties
Brinell Hardness
Rockwell Hardness Number
WT≥0.200 in (5.1mm)
WT≤0.200 in (5.1mm)
137 HRB
77HRB

Mechanical Properties                                    Tests and Inspection

Tensil Streghth: min ksi[Mpa] 47[325]                      Flattening Test  Flaring Test
Yield Point: min ksi[Mpa] 26[180]                              Flange Test         Hardness Test
Elongation: ≥35%                                                         Hydrostatic Test

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

Production Show
Our Company

TorichInternational Co.,Ltd is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes.


Our main products:Seamless Steel Tubes with Carbon and Alloy Steel Grade, Welded Precision Steel Tubes,DOM Steel Tubes, Seamless & Welded Stainless Steel Tubes with Nickel and Alloy Steel Tube.


Our factory was established since 1997, with the name of Haiyan SanxinSteel Pipe Co., Ltd. The factories` technicians are of great engineering experience in steel pipe industry for more than 20 years, who are in great command of production technology for Cold Drawing and Cold Rolling, as well as heat treatment and inspection. So we have strong technician team and manufacturing capability.

Packing & Delivery
1. hexagonal bundles
2. wooden boxes
3. Carton
Our Certifications
Customer Photo
FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us 

TORICH ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers